A maintenance worker was on shift in Sector 7 when the reactor entered critical resonance, seating a circulation filter and testing a local supply breaker. The test succeeded. The failure began elsewhere, in the original lower containment ring.
The worker escaped on foot to the receiver station, outside the containment field, and went back into Sector 7 through Project T-Link as an Operator. The worker and the Operator of the Unlisted Return are the same person.
Not recorded
The record gives no name and no callsign for the worker.
See also
Records cited
- The Last Shift, Liminal Protocol's Story opening